Moss Gold Project

=

Project
Overview

=

Resource
Estimate

=

Robust
PEA

=

Exploration
Upside

=

Project
Overview

=

Resource
Estimate

=

Robust
PEA

=

Exploration
Upside

Potential to be a Top 10 Producing Mine in Canada

Robust Economics with Strong PEA

PEA a Base Case with attractive economics, significant leverage gold prices, optimization upside and extensive growth optionality

High-Quality Mineral Resource Estimate Moss Deposit

Major Infrastructure to Support a Mining District

Nearby Trans-Canada Highway, low-cost power, rail connectivity and deep-water port access at Thunder Bay

Untapped Exploration Upside & Active Drilling

Active multi-purpose drill program targeting grade control, resource expansion and regional discoveries along a 35 km mineralized trend

Management Team with Proven Track Record

Experienced leadership and board with a history of district-scale discoveries, mine development and value creation across multiple jurisdictions

* Au and Ag Indicated resource contained within 64.3 million tonnes; Au and Ag Inferred resource contained within 125.9Mt. The current Mineral Resource Estimate and PEA include only open-pit mineralization. All underground mineralization has been excluded from the resource model and mine plan. For more information on the Mineral Resource Estimate, see the Preliminary Economic Assessment NI 43-101 Technical Report; Effective January 26, 2026.

** The PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Note: all information presented in Canadian dollars unless otherwise stated.

2025 G-MINING SERVICES
OPEN PIT MINERAL RESOURCE ESTIMATE*

Refined Geological Model
focused on higher-Confidence resource

MOSS DEPOSIT  (Jan 16, 2026)

Highlights

73% increase in indicated gold ounces vs prior estimate

Material upgrade in resource confidence, more mineable
resource base

Addition of reportable silver resource
(Indicated + Inferred)

Improved continuity
across mineable domains

* Au and Ag Indicated resource contained within 64.3 million tonnes; Au and Ag Inferred resource contained within 125.9Mt. The current Mineral Resource Estimate and PEA include only open-pit mineralization. All underground mineralization has been excluded from the resource model and mine plan. For more information on the Mineral Resource Estimate, see the Preliminary Economic Assessment NI 43-101 Technical Report; Effective January 26, 2026.

Moss gold project

Open Pit Resource Summary

* Au and Ag Indicated resource contained within 64.3 million tonnes; Au and Ag Inferred resource contained within 125.9Mt. The current Mineral Resource Estimate and PEA include only open-pit mineralization. All underground mineralization has been excluded from the resource model and mine plan. For more information on the Mineral Resource Estimate, see the Preliminary Economic Assessment NI 43-101 Technical Report; Effective January 26, 2026.

Click here for Notes to the Mineral Resource statement

KEY CHANGES WITH NEW MRE

Underground ounces
excluded from resource model

Inferred spacing tightened
to 90m x 90m

Resource Constructed to account for 5x5x5m SMU

Addition of reportable Silver Resource (indicated and inferred)

Updated structural modelling and 2025 drilling
→ Improved grade continuity

Geostatistical improvements
→ more Indicated

Model aligned to
open-pit PEA mine plan

PEA HIGHLIGHTS

Summary Of project Economics

Mineral resources that are not mineral reserves have no demonstrated economic viability. No mineral reserves have been calculated for the Project. There is no guarantee that any part of the mineral resources discussed herein will be converted to a mineral reserve in the future

** The PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized.

Note: all information presented in Canadian dollars unless otherwise stated.

Base Case: Gold US$2,750/oz, Silver US$35.00/oz
CAD/USD $1.34.

Consensus Case: Gold US$3,300/oz, Silver US$40.00/oz CAD/USD $1.35 Source: CIBC Capital Markets.

Upside Case: Gold US$5,000/oz, Silver US$80.00/oz CAD/USD $1.35.

Cash operating costs consist of: mining costs, processing costs and site G&A.

AISC: consist of cash operating costs, royalties, corporate G&A, selling costs and silver credits and excluding pre-production capital costs. Refer to the disclosure under the “Non-GAAP Financial Measures” heading of page 3 of this Presentation for more information.

Base Case illustrates Large-scale gold production

1 Gold equivalency based on payable Gold and Silver and calculated using US$2,750/oz Au, US$35.00/oz Ag. The PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized.

Moss Gold Project has extensive infrastructure to support potential district scale mining camp

Highway 11 –Trans-Canada Highway

Access to road, rail, power, deep water port, water, skilled people & contractors

Power - $0.11 / kwh power at project site

Exceptional width and presence OF HIGH-GRADE SHEARS

* All assays capped at 30 g/t Au
See company news releases for more information, dating: Oct 21 2021, Apr 19 2022, Sep 29 2022, Nov 2 2022, Jan 17 2023, Feb 2 2023, Jan 17, 2025, Mar 3, 2025, Apr 22, 2025, May 15,2025, and Aug 12, 2025.

Maps & Figures

Technical Report

i

Preliminary Economic Assessment NI 43-101 Technical Report
Effective Date: January 26, 2026

Qualified Person

Peter Flindell, P.Geo., MAusIMM, MAIG, Chief Operating Officer of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in the website.

Recent News

Gold X2 Commences Trading on the NYSE American Under Ticker “AUXX”

VANCOUVER, B.C., September 8, 2026: Gold X2 Mining Inc. (NYSE American: AUXX / TSXV: AUXX / FWB: DF8) (“Gold X2” or the “Company”) is pleased to announce that its common shares (the "Common Shares") have commenced trading today on the NYSE American LLC (the "NYSE...

Gold X2 Announces Share Consolidation Effective Date

VANCOUVER, B.C., July 27, 2026 – Gold X2 Mining Inc. (TSXV: AUXX / OTCQB: GSHRF / FWB: DF8) (“Gold X2” or the “Company”) is pleased to announce that the effective date for the previously announced share consolidation (the “Consolidation”) will be July 29, 2026. As...

Explore Gold X2

Team

Meet the experienced team behind Gold X2

News

Checkout the latest on what Gold X2 has been up to

Investors

Everything you need to know to start investing in Gold X2

Notes to the Mineral Resource statement:

1. The mineral resources described above have been prepared in accordance with the CIM Standards (Canadian Institute of Mining, Metallurgy and Petroleum, 2014) and follow Best Practices outlined by the CIM (2019).

2. The Qualified Person, as defined by NI 43-101, (“QP”) for this MRE for both the Moss Deposit and the East Coldstream Deposit is Mr. Dominic Lussier, P.Geo., of G Mining Services Inc., who is responsible for the MRE. The effective date of the MRE is January 16, 2026, and is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate

3. Mineral resources that are not mineral reserves have no demonstrated economic viability. No mineral reserves have been calculated for the Project. There is no guarantee that any part of the mineral resources discussed herein will be converted to a mineral reserve in the future.

4. The quantity and grade of reported Inferred Mineral Resources are uncertain, and there has not been sufficient work to define these Mineral Resources as Indicated or Measured. Further work may result in the upgrading of portions of the Inferred Mineral Resources. There is no certainty that Inferred Mineral Resources will be converted to Measured or Indicated Mineral Resources.

5. The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, market, or other relevant factors.

6. Known underground works at the Moss Deposit have been incorporated into the block model, and zero density has been assigned to the blocks located within the voids.

7. Tonnage estimates are based on individually measured and calculated bulk densities for geological units ranging from 2.69 to 2.725 g/cm³. Overburden density is set at 1.8 g/cm³.

8. A total of 122 mineralized zones for the Moss Deposit (used for both Au and Ag estimation) and 12 mineralized zones for the East Coldstream Deposit were modeled using Leapfrog geo. High-grade capping for gold estimation of between 15.0 and 55.0 g/t (Moss Deposit) and 12 g/t (East Coldstream Deposit) was applied before compositing. High grade capping for Ag estimation of 30.0 g/t (Moss Deposit) was applied before compositing.

9. The MRE was completed using Leapfrog Edge with parent block size of 5 m x 5 m x 5 and a 1.25 m x 1.25 m x 1.25 m minimum sub block size for both the Moss Deposit and the East Coldstream Deposit. Interpolation method used for the Moss Deposit are Ordinary Kriging for the principal shears modeled and ID2 for the secondary shears. East Coldstream Deposit was interpolated using only Ordinary Kriging. Both estimations are using hard boundary between modeled domains.

10. Open pit Mineral Resources are reported within an optimized Geovia Whittle pit shell generated at a surface cut-off of 0.35 g/t Au using a gold price of US$2,200/oz; a USD/CAD exchange rate of 1.33, a mining cost of 3.67/t and a G&A cost from $2.21/t, processing cost of $12.04/t, pit slope angles of 50° for bedrock and 27° for unconsolidated material. Mineral Resources are reported at a cut-off grade of 0.35 g/t Au within this pit shell and are reported as undiluted and in situ.

11. Tonnage has been expressed in the metric system, and gold metal content has been expressed in troy ounces.

12. The tonnages have been rounded to the nearest 1,000 tonne, and the metal content has been rounded to the nearest 1,000 ounce. Totals may not sum due to rounding.